MONASH HEALTH

Australia’s first COVID-19 RESUS Medical Facility at Monash Health was built within 3 weeks, with the modular infrastructure built and installed by SPACECUBE within 15 hours. 

 

Product: Supersafe Vinyl – Sky Blue

Architect: Spacecube

Credit /Installer: True Floor Coverings 

  • Facebook
  • LinkedIn
  • Instagram

© 2018 Airlay International Pty Ltd.
Site design by Antidote Creative.